Build Out Progression

Permanent link

This blog entry will track the progression of the build out of our new location at 10 South Riverside.

10 South Riverside

This will be our new home come December

The view from our new conference room.

Most importantly, the Starbucks on the first floor.

October 10, 2011

Floor was being prepped. The placement of future walls were being drawn on the floor surface.

October 13th, 2011

Floor completely prepped and the studs are starting to go in.

October 17th,2011

View looking north of the office framing.

Duct work, electrical, and overhead plumbing work in progress.

October 27th, 2011

View from the break room looking Northeast.

View from the reception area towards the offices.

November 7th, 2011

View from the reception area towards the offices.

View of the large conference room looking East 

Break room

Ceiling Grid

Main Area

November 15, 2011